banner
Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw 単相非同期誘導 AC 電動機

Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw 単相非同期誘導 AC 電動機

概要 Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw 単相非同期誘導交流電気モーター推奨製品の説明会社概要よくある質問フレームの役割は何ですか
共有

説明

Overview
基本情報
始動モードy-δ 開始
認証ISO9001、CCC、CE
ブランド麗源
ファンPP
C45
ファンカバーA3
カバーアルミニウム
端子箱PPO
ハウジングアルミニウム
輸送パッケージカートンまたは合板
商標麗源
起源すぐ
HSコード8501400000
生産能力50000個/年
製品説明
Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw 単相非同期誘導交流電動機推奨製品の説明

Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw Single Phase Asynchronous Induction AC Electric Motor

Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw Single Phase Asynchronous Induction AC Electric Motor

モデルHPKWカーネットスピードエフ力率TnTmax/インチTst/Tn
ML-112M2-45422.41A144080%0.9726.541.72.5

Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw Single Phase Asynchronous Induction AC Electric Motor

会社概要

Ml 0.18kw 0.37kw 0.75kw 1.5kw 2.2kw 3kw 3.7kw 4kw Single Phase Asynchronous Induction AC Electric Motor(4) Torque. Including the transient electromagnetic torque when the load suddenly changes and the generator is suddenly short-circuited. Among the above loads, torque is the most important. In addition, the frame of a general motor will also be subjected to clamping force, cutting force, lifting force, etc. during processing, transportation, and installation; for motors that require sealing (such as hydrogen-cooled steam turbine generators or explosion-proof motors), the The machine base is also subjected to the action of test pressure. When the end cover bearing and belt (or gear and other transmission mechanisms) are used for transmission, the machine base and its feet will also be subjected to the action of the belt pulling force (or the force of the gear and other transmission mechanisms). . Therefore, when designing the machine base, the mechanical calculation of the general machine base often includes the calculation of its stiffness, strength and natural vibration frequency. The strength calculation of the joint plate bolts needs to be carried out for the half machine base, and the foot plate welding seam needs to be carried out for the welding machine base. The calculation of stress, which is mainly the calculation of the stiffness of the machine base.

弊社の連絡先